What a buying committee asks
0 ✓ documented · 8 declared · 2 in progress · 5 to confirm
The 15 due-diligence questions, with today’s status
📄 Is the title clean?Area per the owner’s title. The lien-free certificate is in progress and is delivered in the data file. in progress
✍️ Can they sell now?The owner declares the plot is ready to sell; powers of attorney and minutes are assembled in the data file. ◐ declared
🧭 Does land use allow it?Precedent from 2013: warehouse operating license and land-use feasibility (validity to be verified). The current municipal certificate is in progress. in progress
🗺️ What are the area and boundaries?8,816.65 m² per title. Approximate outline (KMZ) from the owners; topographic survey to be confirmed. ◐ declared
🛣️ What is the access like?Frontage on a federal highway (Chetumal highway). ◐ declared
📏 What are the distances to logistics nodes?Distances in km measured on the plot outline: in preparation. to confirm
⚡ Is there power, how many MVA and when?Medium-voltage power available (declared by the owner). Capacity in MVA and CFE timeline: to be confirmed; power feasibility is manageable. ◐ declared
💧 Is there water and sewage?No network water connection or sewage declared. Water feasibility: manageable, no document yet. to confirm
🔥 Is there gas and fiber?Can be contracted (declared by the owner). ◐ declared
🪨 What are the soil and topography like?Flat, limestone/rock (declared). Soil mechanics study: to be confirmed. ◐ declared
🌿 Is there an environmental study?No environmental study to date. to confirm
🌊 Is there flood risk?The owner declares there is no flooding. Risk atlas: to be consulted. ◐ declared
🧩 Which permits are missing and how soon can one operate?Permit matrix with timelines: in preparation. to confirm
💲 What is the price, and what comparables exist?Price asked by the owner: $1,500/m² ($13,224,975 MXN in total). Appraisal: not available. ◐ declared
🏭 What is around it and who competes for power and water?The corridor map locates the plots; the surroundings and power-and-water demand analysis is in preparation. to confirm
Approximate outlines provided by the owners. The official area is the one in the title.